ZHINVALI HPP
| CUSTOMER: |
Sakmtavarenergo |
| GEN. DESIGNER: |
Hydroproject (Tbilisi) |
| GEN. CONTRACTOR: |
Sakhydroenergomsheni |
TECHNICAL ASSISTANCE / SERVICES of GEN. CONTRACTOR: |
Orgenergomsheni |
| PARAMETERS: |
| Capacity, MW |
130 |
| Power output, GWh |
4855 |
| Reservoir storage, mln m3 |
370/520 |
| Rated water discharge, m3/s |
110 |
| Discharge through waterways, m3/s |
2200 |
| Rated head, m |
128 |
| TYPE OF REGULATION: |
Seasonal |
| SCOPE OF WORKS: |
| Excavation, ths m3 |
6800 |
| Earth and rock filling, outlining, drainages and filters, ths m3 |
6215 |
| Concrete and reinforced concrete, ths m3 |
335 |
| Installation of structural metal elements and mechanisms, ths t |
34 |
| YEAR OF START UP: |
1985 |
| DURATION OF THE CONSTRUCTION, month |
132 |
Layout of Zhinvali HPP
1. earth-fill dam;
2. cementing conduit;
3. powerhouse;
4. outdoor switchyard;
5. turbine penstock;
6. diversion tunnel;
7. surface waste release spillway;
8. side water spillway;
9. bottom spillway;
10. water intake;
11. free-flow diversion tunnel
ROCK AND EARTH FILL DAM of ZHINVALI HPP
| PARAMETERS: |
| Height, m |
102 |
| Thickness: |
|
| at the crest, m |
9 |
| at the contact with foundation, m |
484.75 |
| Crest length, m |
415 |
| Core: of clay loam; Drainages and filters -
of graveled rock; Lateral prisms – of boulder |
|
|
|
| GEOLOGICAL CONDITIONS: |
| Argillite, marls, marl limestones, embedded separate ,
rate slabs with bands of sandstones and marls
|
|
| SCOPE OF WORKS: |
| Excavation, ths m3 |
5900 |
| Rock and earth filling, ths m3 |
5625 |
| Including: |
|
| Drainage and filters, ths m3 |
165 |
| Contact grouting, ths m3 |
3 |
| Consolidation grouting, ths m3 |
11 |
| Curtain grouting, ths m2 |
14 |
| Concrete and reinforced concrete, ths m3 |
34 |
| Installation of structural metal elements and mechanisms, ths t |
9 |
Dam of ZHINVALI HPP
1. reinforced concrete slabs 0.3m thick
2. coarse gravel;
3. loamy core;
4. extruder concrete in a layer 10-15cm;
5. cementing gallery;
6. double-row curtain grouting up to 80m deep;
7. conveyance coment grouting 10-15m deep
UNDERGROUND POWER HOUSE OF ZHINVALI HPP
| PARAMETERS: |
| Width, m |
15 |
| Length, m |
61 |
| Height, m |
41 |
| Depth of occurrence, m |
110 |
|
|
| GEOLOGICAL CONDITIONS: |
| Lava braccia and tuff braccia |
|
|
|
| SCOPE OF WORKS: |
| Rock excavation, ths m3 |
138 |
| Concrete and reinforced concrete lining, ths m3 |
62 |
| Remark: There are considered works, executed on general powerhouse in the scope |
|
Cross-section through HPP
FREE FLOW DIVERSION TUNNEL OF ZHINVALI HPP
| PARAMETERS: |
| Length of tunnel, m |
8600 |
| Through section, m2 |
5x5 |
| Circular section, m |
5 |
| Rated discharge capacity, m3/s |
110 |
|
|
| GEOLOGICAL CONDITIONS: |
| Highly fissured basalt laves and loose volcanic
wastes; wet clay soils and conglomerates
| |
|
|
| SCOPE OF WORKS: |
| Excavation, ths m3 |
290 |
| Concrete and reinforced concrete lining, ths m3 |
65 |
Zhinvali HPP – Technical assistance component services of construction
| № |
Buildings |
Designation of construction and mounting works |
S e r v i c e s |
Work execution period, years |
| Works organization projects |
Works execution projects |
Areas construction bases and temporary communications projects |
Supervision for implementation of given projects |
Consulting of technical and industrial issues |
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
| 1 |
Earth-Fill Dam, with clay loam core |
Working out of the Dam foundation ditch |
+ |
– |
– |
– |
– |
1972÷1982 |
| 2 |
Earth-Fill Dam, with clay loam core |
Filling of the clay loam core and earth, with the compression technology |
+ |
– |
– |
– |
– |
| 3 |
Underground Powerhouse |
Working (mining) of the rock and lining |
+ |
+ |
+ |
+ |
+ |
| 4 |
Free Flow Diversion tunnel from Powerhouse to buffer basin |
Working (mining) of the rock and lining |
– |
– |
+ |
– |
– |
| 5 |
Main water-supply Zhinvali-Tbilisi |
Preparation, transportation and mounting reinforced concrete pipes d=3,3m and l=4,5m |
+ |
+ |
+ |
+ |
+ |